Now the ceiling is generally more convenient to choose the integrated ceiling, its material selection is also quite a lot, like gypsum board, PVC board, aluminum buckle board, etc., which aluminum buckle board is more popular with the public, its installation and service life Is closely related, each step must be properly constructed, then how to hoist the aluminum alloy ceiling ? Let's take a look.
1. How to hang aluminum alloy ceiling preparation materials and tools
Select 300*300mm size aluminum alloy ceiling material. If the material of the keel, there are foot line light steel, ceiling, etc., there are also ready to fix the hanging line, adjust the steel bar, hooks and screws, there is a cutting machine for cutting Keel material.
2. How to hang the laying keel of aluminum alloy ceiling
To do aluminum alloy ceiling should first install the foot line, mainly because the keel to be installed according to the standard foot line, the length of the foot line should also be measured, can be measured according to the size of the room, the foot line to close to the edge of the tile, and leveling It is best to check the level after installation.
Then you can begin to install the hanging wire, also in accordance with the size of the room to determine the location of the installation, installation needs to use electric drill hole, hole depth can be 30mm, the hanging wire into the hole, to ensure solidity, you can adjust the Screw to ensure its Flatness, where firmness is important, requires personal testing.
Then you can install light steel, first cut the light steel material into the length of the room, you can use electric saws to cut, light steel is to be fixed in the hanging line, to ensure that both ends of the light steel are fixed and fixed, two It is also flat.
Finally, the keel can be laid. The keel is placed between the foot line and the light steel. The two ends are fixed on the foot line respectively. It is not easy to loosen with a special metal joint. Pay attention to the keel. The distance is generally 300mm, which makes it more uniform.
3. How to hang the ceiling of aluminum alloy installation
Keel can be installed after the installation of a formal ceiling, this construction is still relatively simple, as long as the edge of the aluminum alloy ceiling around all the keel into the keel, and then stuck up and stuck on the line, such an aluminum buckle plate The ceiling is completed, and the other gussets continue to be installed. The adjacent ceilings should be consulted at any time during the installation to facilitate the installation and adjust the position in time.
The ceiling at the corner of the wall is different in installation. The main reason is that the size of the edge of the ceiling is different from the size of the ceiling. It must be cut and fit to install it, and the wall will be blocked. The interface is inconvenient to install and must be fixed from multiple angles. The metal buckle of the foot line can be pressed against the edge of the ceiling, so that the edge is not easy to arch, seams, and then the entire inspection will be installed.
Editor's Note: The above is about how to suspend the introduction of aluminum alloy ceilings . Every step in the construction of ceilings requires strict installation requirements. I hope these methods shared by Xiao Bian can help everyone and want to learn more about the construction process. For information, welcome to continue to pay attention to this site.
Wire Stainless Steel Product.
China Kitchen Rack,Sink Grid,Stainless Mesh Storage Baskets,Kitchen Wire Storage, we offered that you can trust. Welcome to do business with us.
Kitchen Rack is made of high quality 304 stainless steel, This kind of material steel luxury, never rust, resist corruption, easily clean, safe, healthy and durable. Prevent rust or chemicals from contaminating food and damaging health
Kitchenware,Bread basket,dish rack,cutting board rack,Sink Grid,dish drying rack
Shenzhen Lanejoy Technology Co.,LTD , https://www.grill-mesh.com