Room type: three rooms, two halls, one kitchen, one bathroom. Construction area: 112 square meters.
Use area: 98 square meters
Decoration budget: 50 million
Contracting method: Half package
Designer: Miss Yang
Duration: September 1, 2009 - November 30, 2009
After two days of knocking on the wall to prepare for material preparation, I saw that the sand seems to be a Sino-Russian joint venture. After thinking about it, it suddenly became clear that Russia had a “tsarâ€. This turned out to be the best sand.
TV background wall and master bedroom partition
The kitchen is laying
Decoration site
balcony
Materials used in decoration
Hydropower renovation
Waterproofing was done, and the balcony was changed. Tiles came into play.
Selection of bricks, flowers, lace
Brick selection
Posted a little better, the kitchen bricks, etc. will be seen after the completion of the effect
This pattern spelling is installed on the door.
living room
Master bedroom window sill
Small balcony window board
Balcony tiles
Kitchen flower piece
Or balcony
bathroom
kitchen
Tiles are basically completed. Carpenters at the top of the kitchen door are required to subsidize the tiles. Woodworking approach!
In the process of carpentry, today's customized iron art (doing entry into the entrance area) is done well. As expected, the iron art plan has been modified and the arrow has been changed into a birdcage, which is quite satisfactory.
My family did not have many things to do, so I made a group of shoe cabinets, a large wardrobe, a balcony with a wall cabinet and a sink cabinet (because the washing machine is relatively high, the balcony is not wide enough to be a tabletop, only Can put a water bucket. Customized outside all the doors), carpentry duration of 10 days.
balcony
Because the bathroom is dry and wet, it is not suitable for adding flowers.
Suspended ceiling
The painter had been doing it for almost two weeks. The uneven walls and tops gradually became more and more flat and whiter. After about another ten days, the paint could be finished.
Suspended ceiling
After two days of hard work, all the doors, door covers, cabinet doors, and lighting fixtures were all installed. It may be taken at night, and then the lights are too bright and too bright, and the colors are a bit distorted.
Indigenous large wardrobe 2.76 meters in height
Wooden door
Entrance
Restaurant lights
Living room light but tightly packaged
Balcony lights
Master bedroom light
The flooring steps are as follows:
The master lays charcoal on the corner of the room and on the corner of the bathroom, and then sprinkles the pest control powder evenly in the cage area, and then spreads the moisture-proof pad. After the preparation is completed, the master begins to unpack the floor and put the floor. Initial classification, then trial shop, and finally start the installation.
Floor installation
Install floor
Floor installation
The door slate was fitted with side slate and was much more complete.
bathroom
After watching the decoration process of the netizen, everyone is not a deeper understanding of the minimalist style of decoration.
Related Links:
>>> Modern minimalist style to create a simple and warm home
>>> Classic: simple and simple one-bedroom
Balcony del floor simple window square meter decoration paint style decoration living room wall color living room lamp kitchen door modern minimalist style decoration living room decoration simple style decoration style modern minimalist style living room modern minimalist style kitchen entrance porch shoe cabinet door partition wall cabinet door shoe cabinet kitchen cabinet Doors Floor Tiles Wardrobe Cabinet Doors Bathroom Tiles Bathroom Doors Bathroom Tiles Color Bathroom Ceiling Material Bathroom Ceilings Bathrooms Waterproof Bathroom Tiles Tiles Tiles Walls Restaurant Ceilings Walls Tiles Kitchen Tiles Balcony Tiles Floor Tiles
Aluminum CNC Machined Components
Aluminum Cnc Machined Components,Aluminum Cnc Machining Parts,Cnc Aluminum Machining Parts,Aluminium Machining Parts
Stand Dragon Industrial Co., Ltd. , https://www.standdragontw.com