Anti-static floor installation tips

The floor is the floor decoration material commonly used in our home decoration. There are many types of flooring, such as solid wood flooring, composite flooring anti-static flooring, etc. Today, let's take a look at the anti-static floor installation method.

First, the introduction of anti-static floor

Anti-static floor, also known as dissipative static floor, is a kind of floor that allows the charge to be dissipated when it is grounded or connected to any lower potential point, with a resistance of 10 to 5 to 9 ohms. The feature is between. "GB50174-2008 electronic information system room design specification" stipulates: the surface resistance or volume resistance of the anti-static floor or the ground should be 2.5 × l0 4th power to 1.0 × 10 9th power ohms.

Second, the installation of anti-static floor

1. Requirements for laying sites

(1) The laying of the floor shall be carried out after the completion of indoor civil construction and renovation;

(2) The ground should be smooth, dry, free from debris and dust;

(3) The space under the floor can be used. The laying of cables, circuits, waterways, air and other pipelines and air-conditioning systems should be completed before the installation of the floor;

(4) The fixing of the large heavy equipment base should be completed, the equipment should be installed on the base, and the height of the base should be consistent with the height of the upper surface of the floor;

(5) The 220V/50HZ power supply and water source are available at the construction site.

2, construction steps

(1) Carefully check the flatness of the ground and the verticality of the wall. If any major defects are found or need to be partially modified, it shall be submitted to the relevant department of Party A;

(2) Pull the horizontal line and use the ink line to hit the wall surface to ensure that the floor after laying is in the same level, measure the length of the room,

Width and selection of the reference position, and the network grid of the mounting support is popped on the ground to ensure neat and beautiful laying, while minimizing the cutting of the floor;

(3), the support to be installed is adjusted to the same required height and the support is placed at the intersection of the ground grid lines;

(4) Fix the truss beam to the support with the mounting screws, and correct the truss beams one by one with a horizontal ruler and a right square to make them both in the same plane and perpendicular to each other;

(5), using a suction plate to place the raised floor on the assembled truss beam;

(6) If the remaining size near the wall is smaller than the length of the raised floor, it can be patched by cutting the floor;

(7) When laying the floor, the level of the blister level is leveled one by one, and the height of the raised floor is adjusted by the adjustable support, which should be handled gently during the laying process.

Prevent scratching the floor and damaging the edge strips, and at the same time, clean it while laying to avoid leaving debris and dust under the floor;

(8) When installing heavy equipment in the equipment room, a support can be installed under the floor of the equipment base to prevent the floor from being deformed;

(9) When the HPL decorative board needs to be cut or opened, the φ6~φ8 cracking hole shall be made at the concave corner of the opening to prevent the cracked floor decoration surface after processing.

Third, the anti-static floor installation needs to be used according to

1. Marble cutting saw;

2. Laser level measuring instrument and network laser scanner;

3, blister level, tape measure, ink line;

4, suction plate, nut adjustment hand, Phillips screwdriver;

5, vacuum cleaners, sputum, mop.

The above is the knowledge about the installation of anti-static floor shared by Xiaobian, because how to install anti-static floor better is also a problem we need to consider. I hope that the sharing of Xiaobian will help everyone.

Toilet Flush Valve

Toilet Flush Valve

Pedal Toilet flush valve is a kind of commercial faucets, widespread use in public toilet, like hospital, station, restaurant, school etc. It made of brass and chrome finished. In-let water size G3/4" or G1", out-let water size G1". The working pressure of the product is 0.05MPa to 0.9MPa. Working temperature is more than 0°

Manual Toilet Flush Valve,Foot-Pedal Toilet Flush Valve,Automatic Toilet Flush Valve,Public Toilet Flush Valves

SHENZHEN KING OF SUN INDUSTRY CO.,LTD , https://www.handybasinfaucet.com